Printable PDF
Vendor: VMware
Exam Code: VCAP5-DCD
Exam Name: VMware Certified Advanced Professional 5 - Data Center Design (VCAP5-DCD)
Certification: VMWare Data Center Virtualization vSphere 5
Total Questions: 279 Q&A
Updated on: Nov 16, 2024
Note: Product instant download. Please sign in and click My account to download your product.
You are a VMware consultant working at a small managed-services company that has won a contract with a large Company A to host its test and dev platform, with the chance on annual review to host its production platform.
Although you have been engaged early in the project, because of business requirements, the budget for the project has already been combined with another DR project for another Company B. The thought process for this decision is that, if
needed, the test systems from Company A have
a lower requirement in the unlikely event of Company B having a DR event.
All the items have been bought and are to be delivered. Your role is to take the equipment provided and construct, develop, and implement a scalable working vSphere platform.
The requirements stated are:
Company A test machines must be provided with sufficient resources for BAU.
Company B systems must be made available with minimum impact to Company A.
The RTO for Company A is seven days, with an RPO of one month.
Company B's RTO is 1 hour, and its RPO is 15 minutes.
The use of a shared infrastructure used in this way is a constraint to the project.
A. True
B. False
As a result of multiple design meetings, it has been stated that the company creating the virtual architecture will be using a NAS device as its storage choice. There is a functional requirement to run a Microsoft application in a Microsoft Cluster Service (MSCS) environment. What is the risk in this setup?
A. The cluster will not perform well in a virtual environment.
B. The cluster will take up a lot of storage space, requiring an abnormal amount of storage.
C. MSCS requires raw device mappings, which cannot be created on a NAS.
D. There will be excessive IOPS as a result of the cluster.
The VCSA can be configured with a small internal Oracle database that can be used to manage up to 5 ESXi hosts or 50 virtual machines.
A. True
B. False
Dwight
Very useful study material, thanks the help of this dumps .
Zuzi
i'm so happy that i passed the exam with full score, thanks for this dumps, thanks all.
Temel
valid 100% thanks for helping me pass the exam.
Mariano
Thanks for guys, I passed the exam with 9xx, I will continue to using your materials.
Uber
I pass my exam with a pretty score. The dumps are good and all the answers are correct. If you want to pass , you can use this dumps.
Andy
Now, i have finished my exam. I really appreciate for the help of this dumps. Thanks very much.
zel
I'm so happy that I passed exam this week. Thanks for this study material and my friend's recommendation.
Olsen
One of my friends told me that your dumps are good and I purchased it. Great. I passed my exam with it. Nice work, guys.
Butt
Absolutely valid. i passed today. You are the best. Thanks so much.
ER
This Dump is 100% valid, Pass today. Dump valid.
The following table comprehensively analyzes the quality and value of VMWare Data Center Virtualization vSphere 5 VCAP5-DCD exam materials.