You are tasked with ensuring that a multitier application will restart correctly during an HA event. Which of the following is required? (Choose two)
A. A specified restart priority for each machine in the application tiers
B. A vApp object
C. A DR and validation process for operations staff manual processes
When given a project requirement for RTO to be satisfied, VMware HA can be used with admission control enabled.
A. True
B. False
An upstream relationship is a logical object or component that has dependency on other items in a solution.
A. True
B. False
Which of the following is a logical boundary for vMotion?
A. Cluster
B. vDC
C. Folder
D. Resource Pool
A ______________ design requires IP addresses and specific hardware selections.
A. conceptual
B. physical
C. logical
D. None of the above
A nonfunctional requirement is similar to a(n) _______.
A. constraint
B. functional requirement
C. risk
D. assumption
If the design specifies an RTO of 3 hours and an RPO of 2 hours, and the system crashes at 8:00 p.m., the application be back online _______________.
A. by 10:00 p.m
B. ASAP
C. by 11:00 p.m
D. by 9:00 p.m
The swap file must always be stored with the other virtual machine files.
A. True
B. False
While viewing the ESXi host resource tab, you notice that you have 1 GB of available memory. You attempt to turn on a virtual machine with a 1 GB reservation, and the virtual machine will not power on. What is preventing the virtual machine from powering on?
A. There are too many virtual machines on the host.
B. For a virtual machine to start, there must be enough available memory for the reservation and memory overhead.
C. A reservation was set too high.
D. A CPU reservation was not set.
A key memory metric to view during system testing is _____________.
A. Ballooning
B. Compression
C. Swap In/Swap Out
D. All of the above