ISTQB TM12 Exam Dumps

  Printable PDF

ISTQB TM12 Exam Dumps

Vendor: ISTQB
Exam Code: TM12
Exam Name: ISTQB-BCS Certified Tester Advanced Level- Test Manager (2012)
Certification: Test Manager
Total Questions: 65 Q&A
Updated on: Dec 16, 2024
Note: Product instant download. Please sign in and click My account to download your product.

PDF Only: $49.99 VCE Only: $55.99 PDF + VCE: $65.99

99.5% pass rate
12 Years experience
7000+ IT Exam Q&As
70000+ satisfied customers
365 days Free Update
3 days of preparation before your test
100% Safe shopping experience
24/7 Support

ISTQB TM12 Last Month Results

385
Successful Stories of ISTQB TM12 Exam
96.4%
High Score Rate in Actual ISTQB Exams
91.7%
Same Questions from the Latest Real Exam

TM12 Online Practice Questions and Answers

Questions 1

The following are the requirements identified as "critical": REQ-SEL-001. The user shall be able to combine all the three products with all the four durations to define an item to purchase. REQ-SEL-002. The user shall be able to add a maximum of six different items to the shopping cart. REQ-PUR-001. The user shall be able to purchase all the items in the shopping cart using a credit voucher. REQ-PUR-002. The user shall be able to purchase all the items in the shopping cart using the available credit already charged on the smartcard. REQ-PUR-003. The user shall be able to purchase all the items in the shopping cart using all the accepted credit cards (Visa, MasterCard and Great Wall Card). REGLOGO-001. The user shall be able to logout (by clicking the logout button) from both the "select" and "purchase" pages going back to the "browse" page (anonymous navigation).

Moreover, the following quality risk item has been identified as "critical":

QR-P1. The web customer portal might not be able to provide the expected response time (less than 10 sec) for the purchase transactions under a load of up-to 1000 concurrent users.

Test analysis for system testing has just begun and the following test conditions have been identified:

TC-SEL-01. Test the combinations of products and durations to define an item to purchase TC-SEL-02. Test the maximum number of items, which can be added to the shopping cart TC-PUR-01. Test the purchase of an item TC-PUR-02. Test the purchase of an item with the credit charged on the smartcard

Assume that you have used traceability to determine the logical test cases that cover all the requirements and the single risk item identified in that scenario.

Which of the following is a positive logical test that is complete, is correct, and covers the REG-LOGO-001 requirement?

A. On the purchase page ("purchase state"), click the logout button; verify that the browse page ("browse state") is displayed.

B. On the select page ("select state"), click the logout button.

C. On the purchase page ("purchase state"), click the logout button; verify that the "Impossible to logout ? complete or cancel the current transaction" message is displayed.

D. On the browse page ("browse state"), click the logout button.

Show Answer
Questions 2

Assume you have some data related to confirmation testing during system testing of a past project.

In that project 240 bug reports have been opened once, 80 were opened twice, 10 were opened three times and no bug reports have been opened more than three times.

You estimate that a bug report, which has failed its confirmation test, costs, on average, 3 person-hours. Which of the following statements correctly describe the value of these confirmatory testing activities based on cost of quality?

A. 300 person-hours have been spent on the project during the system testing phase, because of the failed confirmation tests and this cost belongs to the costs of internal failure.

B. 340 person-hours have been spent on the project during the system testing phase, because of the failed confirmation tests and this cost belongs to the costs of external failure.

C. 340 person-hours have been spent on the project during the system testing phase, because of the failed confirmation tests and this cost belongs to the costs of internal failure.

D. 300 person-hours have been spent on the project during the system testing phase, because of the failed confirmation tests and this cost belongs to the costs of detection.

Show Answer
Questions 3

During the system testing phase, a tester from your test team observes a failure in the system under test and he/she decides to create an incident report. The incident report is currently in a "new" state, indicating it needs to be investigated.

Which THREE of the following information items can't yet be present in the incident report? (Choose three.)

A. The type of defect that caused the failure

B. The actual and the expected result highlighting the failure

C. The lifecycle phase in which the defect has been introduced

D. What really caused the failure (actual cause)

E. Steps to reproduce the failure, including screenshots, database dumps and logs where applicable

Show Answer More Questions

Hot Exams

Why TM12 Dumps Are Worth It

Hannah Johnson

Leads4Pass is one of the best websites I have ever used. It only took me 3 days of preparation to complete my goal plan. Not only that, I was successful with high scores.

Joel C

It was the 16th when I purchased the Leads4Pass materials. They updated the materials on the 18th. When I asked them to send me the latest materials, they quickly sent me the latest ones. The new materials included several of the latest core question types. Finally, I succeeded. Six of the new core questions were completely matched. Thank you!

Martha W

I have used free materials, the privacy is poor, the public content matching rate is too low,I gave up on them because they failed me once. Leads4Pass was recommended by a friend. Both the privacy protection and the preciousness of the materials are very high. By the way, I won this time.

David Frazier

There is nothing more satisfying than success! Their question types are very similar, and they were very helpful to my progress in answering questions during the exam. Thank you.

Dolores N

I need to take multiple certification exams for my organization. There are so many certification exams that I can't help but choose supporting materials. I have tried multiple platforms with some success and failure. In the end, I chose Leads4Pass. It was instant for me. Effective materials are where the real value lies.

Helen Kovac

I was despised by a close friend until he failed twice and I passed once and then he changed his mind. He shared his failure experience with me. He told me that he had been learning through books and looking for free materials. These outdated contents could not really help him. Later I recommended him Leads4Passs and he also succeeded.

Raymond I

I was lucky enough to choose Leads4Pass for the first time. I used their VCE tool to learn, and it was really easy and efficient. I think what’s really amazing is that they can ensure that all materials are industry-leading, which is really amazing.

Leads4Pass Test Manager TM12 Exam Analysis

The following table comprehensively analyzes the quality and value of Test Manager TM12 exam materials.

leads4pass certification exam analysis
ISTQB-BCS Certified Tester Advanced Level- Test Manager (2012)(Test Manager)
PDF
PDF is the simplest and indispensable tool for certification exams. Leads4Pass Test Manager TM12 PDF is suitable for learning in most environments.
VCE
VCE TestEngine is only available on Windows operating systems. Leads4Pass VCE comes at no additional cost and is free forever.No installation required, just unzip and use.Environmental protection and safety.
News
The overall pass rate of Leads4Pass reached 96.4%, Test Manager TM12 successful cases were 385 last month, and the complete hit rate reached 91.7%!
Update
We check the update at least 1-2 times every month. If it is an official update, we will complete the most effective check of the update in 3 working days.
Team
Test Manager (TM12) exam materials are edited, reviewed, and finally sent to the front end by the Leads4Pass ISTQB multi-person team based on actual topics.
100%
100% the most cost-effective price in the industry
100% safe shopping
100% real and effective
100% money back guarantee
Leads4Pass guarantee comes from more than 10 years of experience and reputation