Placement of a buried OSP pathway in public Rights of Way may require a permit based on which of the following?
A. Locating of other utilities
B. Bonding and grounding of metallic conductors
C. Fees calculated on distance
D. Building entrance conduit plugging
A global financial system is being delivered by the program learn to allow access from anywhere in the world Following a new cross-border regulation applying to privacy of local banking data accessed from abroad, the CEO of the bank requests that an external audit be conducted lo validate compliance with this new regulation. This event, which was not anticipated al this phase of the program, will generate additional work tor the program learn. This effort Is not included in the current program roadmap and benefits delivery plan
What immediate actions should the program manager take?
A. Negotiate with the CEO in an attempt to avoid the audit.
B. De-scope the capabilities of the system to not allow access from abroad
C. Accept the risk of the audit and continue the program as planned
D. Assess the impact of the audit and potential remediation on the program
In preparation for the development and submission of the program master schedule to a client, the program manager meets with (he component project manager and master program scheduler to discuss the work breakdown structure (WBS) During the meeting, the master scheduler indicates that the master program schedule should include which of the following?
A. Program benefits and all components protect activities
B. Component resources and their activity assignment/responsibility metrics
C. Program-level activities and integrated component projects
D. Program activities, component activities, and all other work
A critical program for a company fails lo delivers its intended benefits. The CEO and program sponsor are both held accountable and. ultimately, their employment is terminated by the board of directors What should the program manager do before formally closing the program?
A. Update the benefits register
B. Establish a program management information system (PMIS)
C. Share lessons learned with an program team members
D. Transfer all program documentation to the deputy program manager
When considering pathway types, the ICT distribution designer should consider the applicable MICE factors as defined in TIA 568 for structured cabling systems and components MICE 3 relates to
A. commercial environment
B. heavy industrial environment
C. medical environment
D. light industrial environment
To accommodate telephone, data, CATV, security and multimedia, a MINIMUM of ________ strands of optical fiber auxiliary disconnect outlet (ADO) cable should be provided.
A. Two
B. Four
C. Five
D. Six
E. Eight
What is the PRIMARY reason for considering a physical ting topology for connecting outlying buildings?
A. It is the most cost effective design ten a campus network.
B. It provides a redundant cable path for disaster recovery.
C. It is the most compelling design for any network requirement.
D. It is an easier physical design to install.
In an underfloor duct system, pre-set inserts should be leveled to 1/8 inch below the finished pour.
A. False
B. True
What would be the second 25 pair binder group color for a 300 pair cable?
A. Black/Orange
B. White/Orange
C. Red/Blue
D. Violet/Slate