You are a process engineer evaluating Lean vs. Discrete processing. You want to convert a Kanban item. The item has the following Lean setup:
1.
The setup uses a Lean schedule group with a throughput ratio=2
2.
The process activity tied to production flow has the following runtime activity times: time=3 min, per quantity=1
3.
The work cell capacity has a model type of Throughput and an average throughput quantity of 60 per a capacity period of standard workday (8-hour day)
4.
The throughput is 10 per hour
You need to set up a Discrete operation to mirror the item's production flow activity.
What should you do?
A. Create a route with a runtime =1, a process quantity =6, and the operation's hours/time =1
B. Create a route with a runtime =1, a process quantity =10, and the operation's hours/time =1
C. Create a route with a runtime =6, a process quantity =1, and the operation's hours/time =1
D. Create a route with a runtime =10, a process quantity =6, and the operation's hours/time =1
A manufacturing company has a new speaker that is available with standard and premium carbon fiber options.
For the premium option, speakers are made to order. Customers can choose from seven product attributes at different prices.
You need to create and configure the product and pricing for the new speaker.
Solution: Create a constraint-based product with configurations. Use a price model to calculate the different configurable option costs.
Does the solution meet the goal?
A. Yes
B. No
You must ensure that the firepit product is available for sale. How should the product be released?
A. Release the engineering product version and then assign the route.
B. Connect the BOM to an engineering product version before release.
C. Connect a route to an engineering version before release.
D. Release the engineering product version and then assign BOM.
A product is produced through lean manufacturing. The cleaning and inspection is performed by a contractor as an activity of a production flow.
You need to assign the appropriate cost group type for the subcontracted work.
Which cost group type should you use?
A. Direct material
B. Indirect
C. Undefined
D. Direct manufacturing
E. Direct outsourcing
A company uses production orders to assist with timely inventory delivery to the shop floor.
Inventory items for production orders are not being delivered from the warehouse in time for the production runs.
You need to ensure that the inventory items are available when needed.
Which option should you select?
A. Route card
B. Job scheduling
C. Job card
D. Batch job
You need to configure replenishment for the Street Kid YOLO bicycles.
Which configuration should you use?
A. Coverage plan by dimension
B. Master planning parameters
C. Item coverage
D. Default order settings
E. Coverage group
A company produces paints and assembles bicycle frames.
You must account for paint drying time before assembly operations can begin.
You need to set up the operation to encompass queue times.
Which two options can you use? Each correct answer presents pad of the solution.
NOTE: Each correct selection is worth one point.
A. Build capabilities for each resource related to color.
B. Enter a value in the queue time after field for the painting operation.
C. Enter a value in the transit time on the painting operation.
D. Make a resource group for each size and color and assign that group to the operation.
E. Enter a value in the queue time before field for the assembly operation.
DRAG DROP
A discrete manufacturer uses the time and attendance registration for production operations.
All employees register daily clock in and clock out times during a 40-hour. Monday through Friday workweek.
Pay periods are every two weeks. Workers are paid hourly.
The production manager will create work schedules with the following windows:
Mandatory work hours
Work hours during which employees can leave early without accruing absences
Work hours during which employees can work extra time
If a junior production worker works over 90 hours in a pay period. the worker will receive lime and a half over 80 hours. If a senior production worker works over 90 hours in a pay period, the worker will receive double time over 80 hours.
Vou need to configure the system for these requirements.
Where should you configure this functionality? To answer, drag the appropriate forms to the correct requirements. Each form may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view
content.
NOTE: Each correct selection is worth one point.
Select and Place:
DRAG DROP
You need to create the new summer limited edition bicycle in Dynamics 365 in preparation for taking orders.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
Select and Place: