A customer needs to make a REST call to see the enclosures managed by an HPE OneView appliance.
What should the customer include in the request to demonstrate that they have properly authenticated with the appliance?
A. an OVsession cookie
B. an Auth HTTP header
C. a JSON-encoded user name and password
D. a token cookie
Which system configuration condition will prevent customers from migrating a VC domain to HPE One View?
A. HPE Virtual Connect Flex-10/10D modules in the enclosure
B. Integrity servers in the enclosure
C. SMI-S for the enclosure is enabled
D. user defined WWN or MAC addresses
When creating a server profile, which profile setting determines the remove-and-replace behavior for a server blade?
A. Affinity
B. Baseline
C. Hardware Type D. Enclosure Group
What becomes of user interface interactions that take longer than 200 milliseconds?
A. They become asynchronous tasks.
B. They generate a timeout error.
C. The priority of the tasks is raised and they are retransmitted
D. They are retransmitted as lost data packets
Which HP storage platform integrates with HP OneViewto provide automated storage provisioning?
A. 3PAR StoreServ
B. B. store Virtual VCA
C. HP Modular Storage Array
D. StoreOnce VSA
How does HP OneView monitor an HP ProLiant Gen8 server?
A. through the Agentless Management Support (AMS)
B. by gathering SNMP information configured on the operating system
C. by accessing intelligent provisioning
D. by using periodic polling
How do HPE OneView server profile templates help with a software-defined approach to converged management?
A. They are the recipes for building a specific environment, such as a database server.
B. They allow the designation of collections of resource groups by a single name.
C. They provide a powerful way to update and maintain an existing infrastructure.
D. They capture the entire configuration for a resource in a single place for easy management
Users report they are receiving HTTP error statuses of 5xx in the HPE OneView environment
In which area should you begin investigating the root cause of these error messages?
A. client
B. programming
C. resources
D. server
A customer has an existing server environment consisting of G5 and newer HP ProLiant servers managed by HP SIM with Insight Control. The customer needs to implement HP OneView as their new management platform. Which approach should you take to meet the customer's needs?
A. Migrate all servers to HP OneView.
B. Use HP OneView and HP SIM to manage all hosts.
C. Use the Insight Control Management appliance to run in Update-only mode.
D. Continue to use HP SIM with Insight Control to monitor the existing environment and implement HP OneView to monitor G6 and newer servers.
Point and click on the area of the graphic that identifies the area that the Microsoft System center uses to communicate with HPE One View.
Hot Area: