DRAG DROP
Match each HPE technology solution to the customer's business need that it can fulfill.
Select and Place:
DRAG DROP
Match the use case to the management component they should use.
Select and Place:
Refer to the exhibit.
You are installing three Synergy frames for a customer PoC in the configuration shown. The composer is unable to discover the frames.
What is the most likely cause of the problem?
A. Another composer is needed Frame 3
B. Composer 2 is in the wrong frame
C. The management network should be connected to the top and bottom frames
D. The management ring should be connected using the FLM link ports
A customer has 10 HPE BladeSystem enclosures managed by HPE OneView. They want to add three HPE Synergy frames.
What is a proper procedure to manage a new HPE Synergy installation?
A. Use HPE Composer for HPE Synergy frames management
B. Deploy HPE Global Dashboard for HPE Synergy management
C. Add all frames to the existing HPE OneView appliance
D. Deploy a dedicated HPE OneView appliance for HPE Synergy frames
A customer needs a Synergy Proof of Concept (PoC) using Image Streamer.
What is the minimum number of Synergy frames needed for this PoC?
A. 1
B. 2
C. 3
D. 5
One of the DL380 Gen10 servers in your infrastructure has failed to boot after a 3rd party PCle NIC was installed.
What is the most likely cause of this issue?
A. HPE does not allow 3rd party PCle cards.
B. The latest Support pack for ProLiant must be used before accessing any additional 3rd party products in the server.
C. The manufacturer did not digitally sign the correct firmware and HPE Secure Boot halted the process.
D. The iLO interface did not have a correct IP address provided from DHCP.
A customer is learning about the performance enhancements of a new DL380 Gen10 system. How does this system help with performance problems?
A. enables faster L4 cache on CPU
B. provides scalable persistent memory
C. provides compatibility with Intel Broadwell processors
D. eliminates the need for Service Level Agreements for Cloud services and VDI
A customer needs to boot from PXE with IPv6 across the Gen10 servers. Which option must be enabled to use this feature?
A. UEFI Boot with IPv6 enabled
B. Legacy One-Time boot menu
C. UEFI Secure Boot
D. HPE Intelligent Provisioning with IPv6 DHCP
Your customer is on the verge of spending $1,2M on a new HPE Synergy 120000 deployment for the ERP system. Over the next three years they expect to see $600,000 per year in earnings. What would the ROI be for the given purchase?
A. 10%
B. 20%
C. 50%
D. 75%
A customer needs to maximize Hyper-V Live Migration performance. What technology will meet the customer's requirement?
A. virtual extensible LAN(VXLAN)
B. Fibre Channel over Ethernet (FCoE)
C. network virtualization using generic routing encapsulation (NVGRE)
D. RDMA over Converged Ethernet (RoCE)