HOTSPOT
A Synergy integrator has installed a new frame into a rack with two existing frames in the customer's environment. Click where the integrator should verify that the cabling for the management ring was completed correctly.
Hot Area:
DRAG DROP
Use the arrow or click and drag the steps on the left to set up a new HPE Synergy 12000 Frame into the correct order on the right.
Select and Place:
Using composable features, what should a Synergy integrator do to resolve high memory utilization on an HPE Synergy compute module?
A. Use the API to optimize the memory allocation from the HPE Synergy fluid resource pool.
B. Increase the allocated physical memory from the HPE Synergy fluid resource pool, and then reboot the compute module.
C. Take a small outage and reassign the HPE OneView server profile to a higher capacity compute module.
D. Increase the reversed physical memory in the Server Profile (SP), and then reapply.
Refer to the exhibit.
A customer has an HPE Synergy 2-frame configuration, as shown. The customer has a new project and needs to increase the number of compute modules. What is the maximum number of compute nodes that the customer's fabric could support?
A. 24
B. 36
C. 48
D. 60
A customer that uses a third-party storage array plants to set up Fibre Channel (FC) zones with the new HPE Synergy 12000 Frame. Which tool creates the FC zones in a Synergy solution?
A. storage page in the Synergy console
B. Virtual Connect module manager
C. corresponding SAN manager
D. Storage array command line utility
How should a Synergy integrator configure an HPE Synergy solution to provide shared storage to all compute nodes in a single frame?
A. Use Composer to configure the P542D smart array controllers to HBA mode and configure the server profiles to include SAN storage.
B. Import a Linux-based NFS target into Composer and configure the server profiles to include SAN storage.
C. Use Composer to configure a HPE Synergy D3940 storage module as SAN storage and configure the server profiles to include SAN storage.
D. Import a StoreServ 3PAR system into Composer and configure the server profiles to include SAN storage.
A customer needs increased available bandwidth and highly available network Virtual Connect interconnects.
Which two steps must the Synergy integrator perform in the configuration to meet the customer's needs? (Choose two.)
A. Link Ports L1 and L4 on Master ICMs to ports L1 and L2 on the first Satellite ICM.
B. Install Redundant Frame Link Modules and a second management ring.
C. Enable Multimodule Link Aggregation Group (MLAG).
D. Enable Intelligent Resilient Fabric (IRF) on the Virtual Connect Modules.
E. Connect Ports Q7 and Q8 on the Master Interconnect Modules (ICM).
A Synergy integrator is working with a customer to perform a first-time setup of a 3-frame Synergy environment. The following fabric modules are installed: Frame 1
Bay 1
A customer need four Synergy compute nodes to provide virtual machine access to six VLANs over a single link aggregation group.
How can the Synergy integrator configure the environment to meet the customer's needs?
A. Create a single tunnel network and assign it to one or more interfaces in the server profile template.
B. Create six untagged networks and assign them to one or more of the interfaces in the server profile template.
C. Create six untagged networks, associate them with an IP address pool, and assign them to one or more of the interfaces in the server profile template.
D. Create six untagged networks, add them to a network set, and assign that network set to one or more interfaces in the server profile template.
A customer is planning an HPE Synergy solution with 20 frames and needs to minimize the number of management ports that are required to connect the frames into the existing management network.
Which procedure should the Synergy integrator use to address the customer's concern?
A. Connect FLMs from all frames into a management ring. Then connect the management ring to the customer's management network using two uplinks.
B. Connect FLMs from all frames to two external switches for redundancy. Then connect the two uplinks from the two switches into the customer's management network.
C. Connect the RJ-45 front ports of each frame to two external switches for redundancy. Then connect the uplink from the two switches into the customer's management network.
D. Connect the RJ-45 front ports of each frame to an external switch. Then connect the uplink from the external switch into the customer's management network.