When using the DMO of SUM, which files can be handled by SUM in the download directory?
There are 2 correct answers to this question.
Response:
A. Parameter file SAPup_add.par
B. Stack XML file calculated by the Maintenance Planner
C. Breakpoint configuration file SAPUPPHAS.BRK
D. MIGRATE J5T_DUR_XML file from a previous run
In which scenarios do you need to use SUM 2.0 instead of SUM 1.0?
There are 2 correct answers to this question.
Response:
A. Upgrading to SAP ECC 6.08 without using DMO
B. Using DMO when applying Support Packages to SAP ECC 6.07
C. SAP S/4HANA conversion to SAP S/4HANA 1709
D. Updating to SAP ECC 6.07 using DMO
What do you need to know about the SAP ERP Upgrade and Update Guide?
There are 2 correct answers to this question.
Response:
A. It contains a troubleshooting section
B. It is target release specific
C. It contains a section "free space requirements"
D. It is a database-specific document
You are using the maintenance planner to calculate the required software components for your SAP S4HANA conversion. What do you need to know regarding SUM?
A. AA
B. As soon as the next SP level of SUM is available, the current version of SUM passes into "patch on request mode" immediately.
You are planning an SAP S/4HANA conversion. Which conversion-specific tasks need to be performed during the preparation phase?
There are 2 correct answers to this question.
Response:
A. Run the database migration to the SAP HANA database
B. Perform the migration of data into the new data structure
C. Check the compatibility of custom code with SAP S/4HANA
D. Apply the recommendations of the simplification list
You are upgrading a three-system landscape DEV - QAS - PRD. The upgrade project contains a Unicode conversion. You have already upgraded the DEV and the QAS system but not yet the PRD system. What do you need to consider? Please choose the correct answer.
A. The upgrade of the PRD must be finished before you start new development in the DEV.
B. The transport domain of systems DEV and QAS must differ from the transport domain of system PRD.
C. The transport between Unicode and non-Unicode systems is forbidden.
D. The upgrade of the PRD must be finished before you import any transports from the upgraded DEV system into the PRD.
The SUM procedure stops with an error during uptime. How can you identify the current phase, the one in which SUM encountered an error?
There are 2 correct answers to this question.
Response:
A. Check the most recent entries shown in file sapevt.trc
B. Check the system log (transaction SM21) of the SAP system
C. Check the messages shown by the SUM UI
D. Check the most recent entries in SAPup.log
Regarding an SAP Upgrade, What does the major SAP Note for the version of SUM you are using usually contain?
A. The link to different patch levels to SUM
B. AA
C. The corrections to the SUM Guide
D. An overview about possible upgrade paths
You are performing an upgrade with SUM using DMO to an AS ABAP 7.50 based SAP system. You entered a specific number of R3Ioad processes during Roadmap step "Extraction".
Where can you change this during the migration via the Utilities option of the SUM UI?
There are 2 correct answers to this question
Response:
A. In SUM Phaselist
B. In Process Control Center
C. In SUM Parameters
D. In DMO Migration Preparation
You want to use the downtime-optimized data conversion for your SAP S/4HANA conversion. What is the main difference from a standard SAP S/4HANA conversion?
Please choose the correct answer.
Response:
A. An additional temporary database is used during uptime
B. Dedicated application tables are migrated in uptime
C. TABIMJJPG is executed in uptime
D. The repository is migrated in uptime