Leads4pass > EMC > VxRail Appliance > E22-285 > E22-285 Online Practice Questions and Answers

E22-285 Online Practice Questions and Answers

Questions 4

When adding a VxRail node the validation fails. What could be the cause of this problem?

A. IPv6 multicasting is not enabled

B. Only one network interface online

C. Time on the node was not set correctly

D. DNS record was not created

Buy Now
Questions 5

Which software is included with VxRail and provides continuous replication of virtual machines deployed on a VxRail appliance?

A. VMware VM Snapshots

B. Dell EMC RecoverPoint for VMs

C. VMware vSphereData Protection

D. Dell EMC RecoverPoint CRR

Buy Now
Questions 6

Which method can be used to reset a VxRail V Series node?

A. Rapid Appliance Self Recovery

B. Bootable ISO Image

C. Mobile Build Server

D. Reset Script

Buy Now
Questions 7

A company has chosen to deploy an external vCenter/PSC. They would like to use the bundled vCenter

license that comes with VxRail.

What is the correct procedure to do this?

A. Contact EMC Licensing to have a replacement vCenter license generated.Next, license the newly created vCenter.Last, deploy VxRail with external vCenter.

B. Contact VMware Licensing to have a replacement vCenter license generated.Next, license the newly created vCenter.Last, deploy VxRail with external vCenter.

C. Log into VxRail Manager through SSH and extract the vCenter license key from the application properties file.Next, license the newly created vCenter.Last, deploy VxRail with external vCenter.

D. Bundled vCenter license is only valid when vCenter is internally deployed. The company must provide their own vCenter license.

Buy Now
Questions 8

In a VxRail Stretched Cluster built from eight all-flash nodes, what should be the recommended storage policy to ensure the highest possible protection?

A. Raid-1(Mirroring) FTT=1

B. Raid-1(Mirroring) FTT=2

C. Raid-5/6(Erasure Coding) FTT=1

D. Raid-5/6(Erasure Coding) FTT=2

Buy Now
Questions 9

When preparing for a VxRail deployment, which components require forward and reserve DNS records?

A. ESXi hosts, vRealize Log Insight, and Platform Services Controller

B. Platform Services Controller. vCenter, and ESRS/VE

C. ESXi hosts, vCenter, and vRealize Operations

D. ESXi Hosts, vCenter, and ESRS/VE

Buy Now
Questions 10

Which software component is an optional add-on for VxRail?

A. Dell EMC Secure Remote Support

B. VMware vRealize Log Insight

C. VMware vSAN

D. VMware vRealize Operations

Buy Now
Questions 11

In a VxRail external vCenter deployment, which component(s) are automatically licensed?

A. vCenter only

B. vCenter and vSAN

C. None

D. vSAN only

Buy Now
Questions 12

During a node add procedure the new node cannot be discovered. A ping to the IPv6 address is

responding.

What could be the cause of this issue?

A. Only one network interface is up on the new node

B. vSAN VLAN is not configured correctly

C. Management VLAN ID is not set on the vmk0 interface

D. Loudmouth process is not running

Buy Now
Questions 13

An all-flash VxRail cluster has just been deployed. When attempting to enable compression, the option is grayed out. What is the cause of this situation?

A. "Add disks to storage" is set to manual

B. Erasure Coding is not enabled

C. Erasure Coding is not disabled

D. "Add disks to storage" is set to automatic

Buy Now
Exam Code: E22-285
Exam Name: VxRail Appliance 4.x Deployment and Implementation Exam
Last Update: Nov 20, 2024
Questions: 80
10%OFF Coupon Code: SAVE10

PDF (Q&A)

$49.99

VCE

$55.99

PDF + VCE

$65.99