Questions 4

DRAG DROP

What is the correct sequence of operations used by the PowerProtect DD DIA in the end-to-end verification process?

Select and Place:

Buy Now
Questions 5

DRAG DROP

What are the steps to configure the Retention Lock Compliance?

Select and Place:

Buy Now
Questions 6

A technician is upgrading a DD9400 with a DS60 expansion shelf with 60 drives. In the GUI interface, only 30 drives are accessible. What is causing these drives to be inaccessible?

A. There are not enough cache drives on the DD9400 to support the extra capacity.

B. A second SAS connection from DD9400 to DS60 is not activated.

C. There are not enough spare drives.

D. The capacity license applied is only for 30 drives.

Buy Now
Questions 7

A PowerProtect DD system is configured for VTL. The backup application requires a minimum tape capacity of 800 GB. What is the minimum tape type to support this requirement?

A. LTO-5

B. LTO-3

C. LTO-2

D. LTO-4

Buy Now
Questions 8

An administrator is scaling Cloud Tier for a DD9400 by adding a second cloud unit. What is the required amount of metadata storage (TB)?

A. 120

B. 240

C. 300

D. 500

Buy Now
Questions 9

A customer needs to use DD Retention Lock Compliance to ensure that data integrity is maintained.

Which PowerProtect DD systems meet the customer's requirement?

A. DD3300, DD6900, and DD9400

B. DDVE, DD3300, and DD6900

C. DD6900, DDVE, and DD9400

D. DD9400, DDVE, and DD9900

Buy Now
Questions 10

When the PowerProtect DD system boots up for the first time, the CLI configuration wizard script does not start automatically.

Which command can be used to start the script manually?

A. configure terminal

B. config setup

C. setup config

D. config wizard

Buy Now
Questions 11

What are some possible network bottlenecks for a PowerProtect DD?

A. Configuration, wire speeds, switches and routers

B. Connectivity, routing protocols, and configuration

C. Connectivity, firewalls, and routing protocols

D. Routing protocols, switches and routers, and wire speeds

Buy Now
Questions 12

An administrator recognizes poor network performance when using CIFS shares from a PowerProtect DD system. The network link utilization is under 100%.

What is the most likely cause of this issue?

A. TCP window size too small

B. TCP timeout too small

C. TCP timeout too large

D. TCP window size too large

Buy Now
Questions 13

A backup administrator is tasked with monitoring PowerProtect DD capacity metrics. The administrator is backing up 2 TB of data daily with a reduction rate at 5x. After data reduction, subsequent full backups compress down to 100 GB.

The initial backup requires 400 GB with a 10 percent increase in the data each day. Each incremental backup is 200 GB. After data reduction, each incremental backup is 20 GB.

What is the weekly burn rate (GB) after six daily incremental backups and one weekly backup?

A. 200

B. 220

C. 400

D. 440

Buy Now
Exam Code: DES-DD23
Exam Name: Implementation Engineer - PowerProtect DD
Last Update: Jan 18, 2025
Questions: 54
10%OFF Coupon Code: SAVE10

PDF (Q&A)

$49.99

VCE

$55.99

PDF + VCE

$65.99