Leads4pass > EMC > DCS-IE > DES-1221 > DES-1221 Online Practice Questions and Answers

DES-1221 Online Practice Questions and Answers

Questions 4

When planning rack layout, why should base enclosures be grouped together?

A. Power distribution requirements

B. Rack weight balance

C. Ease of cable management

D. Hot aisle requirement

Buy Now
Questions 5

What does the remote replication Failover operation do?

A. Fully synchronizes the source and destination data states and reverses the replication direction

B. Fully synchronizes the source and destination data states and stops the current replication session

C. Promotes the destination system to production with its replica data consistent to the last successful RPO synchronization state

D. Promotes the destination system to production and resets the RPO synchronization cycle in the protection policy

Buy Now
Questions 6

A protection policy with snapshot and replication rules is applied to a file system. What is the result?

A. Applying the protection policy to the file system fails

B. Replication rules get ignored and only snapshot rules get applied

C. Both replication and snapshot rules get applied

D. Snapshot rules get ignored and only replication rules get applied

Buy Now
Questions 7

What does the data import session Pause operation do?

A. Deactivates the host to PowerStore control path

B. Stops the source to PowerStore background copy operation

C. Stops the source to PowerStore cutover operation

D. Deactivates the host to PowerStore data path

Buy Now
Questions 8

An administrator assigns a protection policy to a volume group. Volume1, Volume2, Volume3 are put into the volume group. Later it is decided that Volume2 should be replicated at a different time. Volume2 is removed from the volume group.

The administrator attempts to assign a new protection policy to Volume2 and the option is greyed out.

Why is the option greyed out?

A. Already has a protection policy from the Volume-Group

B. Requires a replication rule not a protection policy

C. Requires a snapshot rule and a replication rule

D. Still has associated Volume-Group snapshots

Buy Now
Questions 9

How is the upgrade process on a multi-appliance cluster run?

A. Master appliance primary node first, then the peer node

B. On one node at a time

C. On all primary nodes first, then peer nodes

D. In parallel on all nodes

Buy Now
Questions 10

How is the VASA provider registered with vSphere when connecting to a PowerStore X system?

A. VASA is unsupported in PowerStore X models

B. Built into the PowerStore X system code

C. Automatically added during Initial Configuration

D. Manually added from vCenter server using add storage provider option

Buy Now
Questions 11

A PowerStore T administrator discovers that only one port on each node is active and passing traffic. The other port is healthy and online, but total bandwidth is only half of what the customer expects. Which action could resolve the issue?

A. Configure VLT and Link Aggregation Control Protocol

B. Implement VLT and Dynamic Link Aggregation Group

C. Configure Link Aggregation Control Protocol and Dynamic Link Aggregation Group

D. Implement Dynamic Link Aggregation Group

Buy Now
Questions 12

A customer wants to add capacity to their PowerStore 5000T. The system is populated with 6 NVMe SCM 750 GB drives. What is the maximum number and type of drives that can be added to the base enclosure?

A. 15 NVMe SCM

B. 15 NVMe SSD

C. 17 NVMe SCM

D. 17 NVMe SSD

Buy Now
Questions 13

1.a.1 What is the maximum number of appliances that can be connected to form a cluster?

A. 1 in a PowerStore T cluster, 4 in a PowerStore X cluster

B. 1 in a PowerStore T cluster, 1 in a PowerStore X cluster

C. 4 in a PowerStore T cluster, 4 in a PowerStore X cluster

D. 4 in a PowerStore T cluster, 1 in a PowerStore X cluster

Buy Now
Exam Code: DES-1221
Exam Name: Specialist - Implementation Engineer, PowerStore Solutions
Last Update: Nov 14, 2024
Questions: 54
10%OFF Coupon Code: SAVE10

PDF (Q&A)

$49.99

VCE

$55.99

PDF + VCE

$65.99