Leads4pass > ISQI > ISQI Certifications > CTAL-TM_UK > CTAL-TM_UK Online Practice Questions and Answers

CTAL-TM_UK Online Practice Questions and Answers

Questions 4

Continuing with the Scenario described in the previous question, which of the following topics would you need to address in detail in the master test plan?

A. An approach to regression testing

B. A list of boundary values for "advance amount"

C. A description of dependencies between test cases

D. A logical collection of test cases

Buy Now
Questions 5

Given is the following defect removal chart reported at the end of system testing - showing total defects detected and closed defects (fixed and successfully retested). A number of open defects are classified as critical. All tests have been executed.

Based on the chart above, what is the most appropriate next test phase?

A. Acceptance testing to verify the business process

B. Acceptance testing to verify operational requirements

C. Requirements testing as part of testing regulatory compliance

D. Another system test cycle to verify defect resolution

Buy Now
Questions 6

A test assessment has been carried out using the selected model as a reference framework. A number of recommendations have been identified and you are asked to prioritize them. Based on your knowledge of the project, you are expecting severe resistance to change.

Which of the following would be the most important selection criterion for defining the priority of the recommendations?

A. Synchronized with the overall long-term organizational strategy

B. Defined according to the maturity model used

C. Most visible to stakeholders

D. Low costs actions first

Buy Now
Questions 7

Which of the following is a valid drawback of independent testing?

A. Developer and independent testing will overlap and waste resources.

B. Developers loose the sense of responsibility and independent testers may become a bottleneck.

C. Independent testers need extra education and always cost more.

D. Independent testers will become a bottleneck and introduce problems in incident management.

Buy Now
Questions 8

Which of the following would be the TWO most appropriate examples of entry criteria documented in the system integration test plan?

A. The percentage of decision coverage achieved during unit testing.

B. The availability of the latest version of the capture-replay tool (for testing the interface with the newly developed test management tool).

C. The sign-off of a performance test software release note (test item transmittal report) by both development and testing showing that system performance meets the specified acceptance criteria.

D. The percentage of acceptance test procedures scheduled for execution.

E. The percentage of requirements coverage achieved during system integration test.

Buy Now
Questions 9

As part of the improvement program, the organization is also looking at tool support.

Which type of tool could be used to ensure higher quality of the code to be reviewed?

A. Review tool

B. Test execution tool

C. Static analysis tool

D. Test design tool

Buy Now
Questions 10

What is the main reason why reviews are especially beneficial in the above-mentioned scenario?

A. They ensure a common understanding of the product.

B. They find defects early.

C. They enhance project communication.

D. They can be performed without exercising the code.

Buy Now
Questions 11

Since the system is in the medical domain and therefore in the safety critical area, testing needs to be rigorous and evidence is required that the system has been adequately tested. Identify THREE measures that would typically be part of the test approach in this domain and which are not always applicable in other domains!

A. High level of documentation

B. Failure Mode and Effect Analysis (FMEA) sessions

C. Traceability to requirements

D. Non-functional testing

E. Master test planning

F. Test design techniques

G. Reviews

Buy Now
Questions 12

A test log is one of the documents that need to be produced in this domain in order to provide evidence of testing. However, the level of detail of test logs can vary. Which of the following is NOT an influencing factor for the level of detail of the test logs being produced?

A. Level of test execution automation

B. Test level

C. Regulatory requirements

D. Experience level of testers

Buy Now
Questions 13

Considerable attention will be given in this project to defining exit criteria and on reporting back on their status. Which combination of TWO exit criteria from the list would be best to use?

I. Total number of defects found

II. Percentage of test cases executed

III. Total test effort planned versus total actual test effort spent

IV.

Defect trend (number of defects found per test run over time

A.

(i) and (ii)

B.

(i) and (iv)

C.

(ii) and (iii)

D.

(ii) and (iv)

Buy Now
Exam Code: CTAL-TM_UK
Exam Name: ISTQB Certified Tester Advanced Level - Test Manager
Last Update: Dec 20, 2024
Questions: 65
10%OFF Coupon Code: SAVE10

PDF (Q&A)

$49.99

VCE

$55.99

PDF + VCE

$65.99