Leads4pass > IBM > Technical Sales Specialist > C9010-251 > C9010-251 Online Practice Questions and Answers

C9010-251 Online Practice Questions and Answers

Questions 4

A customer has a 4-node cluster serving a few different applications. The storage requirements are not clearly defined and would be very unpredictable.

How would shared storage pools benefit this customer?

A. They reduce the total required storage by half.

B. They eliminate the need for multiple repository disks.

C. They reduce I/O bandwidth by sharing the LUNs.

D. They reduce the time and effort needed to allocate storage.

Buy Now
Questions 5

The Payment Card Industry Data Security Standard (PCI DSS) has the following requirements to meet compliance:

"Secure audit trails so they cannot be altered."

"Verify that current audit trail files are protected from unauthorized modifications via access control mechanisms, physical segregation, and network segregation."

Which Power SC offering will support these requirements?

A. Trusted Network Connect

B. Trusted Logging

C. Trusted Audit

D. Trusted Surveyor

Buy Now
Questions 6

What is the main function of the P0WER8 CAPI feature?

A. It improves memory bandwidth.

B. It improves cache coherency.

C. It increases the clock frequency speed.

D. It connects auxiliary processors such as GPUs.

Buy Now
Questions 7

A customer requires each AIX or IBM i LPAR to have access to two different VLANs but without VLAN tagging. They plan to have dual VIO Servers on the same POWER8 system, using Ether Channel and SEA for each VLAN.

What is the minimum requirement to support the configuration?

A. (2) quad port Ethernet adapters

B. (4) quad port Ethernet adapters

C. (2) dual port Ethernet adapters

D. (4) dual port Ethernet adapters

Buy Now
Questions 8

In addition to the media slot , S824 GEC also integrates Which of the following ?

A. (6 个) USB port

B. (10 个) Gb HMC port

C. an RDX module

D. a half-height LTO drive slot

Buy Now
Questions 9

Easy Tier feature on what support S822?

A. (8) drives and a split backplane

B. (12) drives and a split backplane

C. (12) drive , do not split backplane

D. (8) SAS drives and an auxiliary controller

Buy Now
Questions 10

A customer is interested in migrating a PostgreSQL workload to POWER8 servers, but is concerned about costs.

Which system would be most competitively priced compared x86 servers?

A. S824L

B. S814

C. S812L

D. S822

Buy Now
Questions 11

A company wants to consolidate six existing AIX workloads onto a single POWER8 server with six LPARs. Which server option will satisfy the requirement?

A. S824 with PowerKVM

B. S822L with PowerVM

C. S822 with PowerVM Express D. S822 with an HMC

Buy Now
Questions 12

A customer has a Power 740 with 16 cores and 64GB RAM, running an Oracle database. The server is attached to an EXP24S with 20 disks 300GB 10K RPM and has been experiencing performance issues. After an analysis there were some findings:

Average CPU usage for the database is 30%

Average Memory usage is 60%

High I/O waits are being experienced, around 50% of total CPU

An Oracle sales representative ran a POC of an Exadata X4-2 Half Rack to help with the performance

issues.

The performance on Exadata was better than the existing solution, so the customer called IBM,

considering a migration to a new Oracle solution.

Which response is appropriate to defend the IBM solution?

A. Exadata X4-2 Half Rack has four servers with two sockets each. It should be compared with the performance of a POWER 770 which can also scale up to eight sockets. IBM can propose an upgrade scenario to even move partitions without downtime with LPM.

B. Exadata is a solution comprised of servers, disk storage, flash storage, networking and software. Your server is apparently fine, but there might be a problem with storage. IBM can propose a faster storage solution, allowing you to keep the server and optimize your costs.

C. Exadata might have run the Oracle database faster due to the fact that it is powered by Oracle SPARC T5 processors which were designed for Oracle software. On the other hand, other workloads will definitely run slower, so you should stick to the existing solution for a balanced performance across your environment.

D. Exadata is comprised of a cluster of servers connected by Infiniband. You are comparing this to a single server. IBM can propose a second server with an Infiniband network to address this issue.

Buy Now
Questions 13

A customer has a SAN team that wants to be able to easily map each LUN to a specific WWPN on each client LPAR of a POWER8 server.

Which technology should be implemented to satisfy the requirement?

A. NPIV

B. vSCSI

C. iSCSI

D. SAS

Buy Now
Exam Code: C9010-251
Exam Name: Power Systems with POWER8 Scale-out Technical Sales Skills V1
Last Update: Nov 18, 2024
Questions: 156
10%OFF Coupon Code: SAVE10

PDF (Q&A)

$49.99

VCE

$55.99

PDF + VCE

$65.99