A user belongs to two non-independent security groups, Group A and Group B. Group A has a purchasing limit of $7000 and Group B has a purchasing limit of $8000.
What is the purchasing limit of a user who belongs to both security groups?
A. $7000
B. $8000
C. $15000
D. $56000
A custom field has been added to the Work Order Tracking application to identify the inspector for environmental impacts of each work order.
What type of role is used to assign the work order to the environmental inspector?
A. Person
B. Person Group
C. A set of data related to the record
D. A set of data related to the login user
A company wants to trigger a PM based on a characteristic type meter. How can this be accomplished?
A. Create a master PM and link to the characteristic on the Related Records tab.
B. Create a condition monitoring point and specify the PM on the upper or lower limit.
C. Create a PM against the asset and specify the meter on the Frequency tab of the PM.
D. Create an escalation based on the characteristic meter and trigger the PM via an action.
A company has a work order with 50 separate tasks and 40 of the tasks have been completed. The company would like the remaining 10 tasks grouped with a new parent work order.
Which option will group the tasks?
A. Select the task work orders and Create Work Package.
B. Select the task work orders Create Job Plan from Work Plan.
C. Create a new work order and add the task work orders on the Plans tab.
D. Create a new work order and add the child work orders on the Plans tab.
Cutover work from cooling to heating is performed on the air handling units during the month of October each year. A requirement is to have the PM record generate Work Orders every Sunday during October.
What settings are necessary?
A. Frequency = 1, Frequency Units = MONTHS, and Active Dates values entered on the Seasonal Dates tab
B. Frequency = 7, Frequency Units = DAYS, and Active Days and Dates values entered on the Seasonal Dates tab
C. Frequency = 7, Frequency Units = DAYS, and Generate Work Order When Meter Frequency is Reached checked
D. Frequency = 1, Frequency Units = WEEKS, and Use Last Work Order's Start Date to Calculate Next Due Date checked
A planner has developed an ad hoc report with information specific to a variety of locations and assets.
The planner wants to automatically run and receive this report every Monday at 7am as well as having it
sent to a maintenance supervisor.
What reporting feature enables this?
A. Escalation
B. No Request Page
C. Maximo Scheduler
D. Scheduling and Emailing
A planner has a high priority work order which is going to consume an item with limited availability and wants to ensure that the item is dedicated to this work order. What type of reservation should the planner use?
A. SOFT
B. HARD
C. APSOFT
D. BACKORDER
Which of the following describes the work list section in the Assignment Manager application?
A. A work order closing center
B. A joined view of work orders and assignments
C. A list of work orders by priority and response time.
D. A list of unassigned work plan labor and crew requirements
A workflow process design requires that the record be sent to the QA group if the QA Required field (a
custom field) is checked. Otherwise it can continue on to the production department.
What type of node is used to enable this?
A. Decision
B. Condition
C. Interaction
D. Subprocess
A planner has a requirement to track records via the Inventory application as well as the Assets application. What type of item can be used to track these records?
A. rotating
B. material
C. standard
D. non-rotating