Which formula function can be used to calculate the last reading for the meter on an asset or location?
A. SPECATTRVAL
B. METERVAL
C. METERAVGVAL
D. METERMAXVAL
Maximo for Nuclear Power supports best practice business processes by providing ready to use workflows based on?
A. A Nuclear Regulatory Commission audit
B. Standard Nuclear Process Model
C. Workflows used by selected Maximo customers
D. Maximo Best Practices
As of version 7.6.1, Maximo Enterprise Asset Management (EAM) supports which three operating systems for an on-premise deployment?
A. Red Hat Enterprise Linux V6
B. Window Server 2016
C. AIX
D. Debian Linux
E. Red Hat Enterprise Linux V7
F. HP-UX V11
If the ITEM table in Maximo contains translatable columns, what would be the format of the translatable table in the database?
A. L_ITEM
B. T_ITEM
C. A _ITEM
D. LANG_ITEM
Which statement is true when working with Sites?
A. Assets are at the Site level.
B. Sites can have multiple holding locations.
C. Each Organization must have a default Site.
D. Sites can be shared across Organizations.
In addition to persistent database fields, what other fields can a user add to a Query Based Report (QBR)?
A. non-persistent fields
B. domain value
C. alias fields
D. calculated fields
Which two Maximo Enterprise Asset Management Security (EAM) Groups are available out of the box?
A. EVERYONE
B. MAXREGISTER
C. MAXADMIN
D. MAXDEFAULT
E. MAXALLUSERS
An individual organization in Maximo Enterprise Asset Management (EAM) wishes to have a slightly different General Ledger (GL) Account Code structure than others in the database. Where would this be configured?
A. Database Configuration
B. Security Groups
C. Chart of Accounts
D. Organization
In Maximo Enterprise Asset Management (EAM), which type of record would be created in the Item Master to represent a consumable stocked material?
A. Spare Part
B. Non-rotating item
C. Non-rotating asset
D. Special order item
Which methods of calculation within a schedule are used to calculate percent complete with Scheduler Plus?
A. Date, Estimate, Contractor
B. Date, Estimate, Task
C. Actual, Physical, Contractor
D. Actual, Physical, Task