You are evaluating which migration method Litware can implement based on the current environment and the business goals. Which migration method will cause the least amount of downtime?
A. Migrate SAP ECC to SAP Business Suite in HANA, and then migrate SAP to Azure.
B. Use Near-Zero Downtime (NZDT) to migrate to SAP HANA and Azure during the same maintenance window.
C. Use the Database Migration Option (DMO) to migrate to SAP HANA and Azure during the same maintenance window.
D. Migrate SAP to Azure, and then migrate SAP ECC to SAP Business Suite on HANA.
You have an Azure subscription.
Your company has an SAP environment that runs on SUSE Linux Enterprise Server (SLES) servers and SAP HANA. The environment has a primary site and a disaster recovery site. Disaster recovery is based on SAP HANA system
replication. The SAP ERP environment is 4 TB and has a projected growth of 5% per month.
The company has an uptime Service Level Agreement (SLA) of 99.99%, a maximum recovery time objective (RTO) of four hours, and a recovery point objective (RPO) of 10 minutes.
You plan to migrate to Azure.
You need to design an SAP landscape for the company.
Which options meet the company's requirements?
A. Azure virtual machines and SLES for SAP application servers SAP HANA on Azure (Large Instances) that uses SAP HANA system replication for high availability and disaster recovery
B. ASCS/ERS and SLES clustering that uses the Pacemaker fence agent SAP application servers deployed to an Azure Availability Zone SAP HANA on Azure (Large Instances) that uses SAP HANA system replication for database high availability and disaster recovery
C. SAP application instances deployed to an Azure Availability Set SAP HANA on Azure (Large Instances) that uses SAP HANA system replication for database high availability and disaster recovery
D. ASCS/ERS and SLES clustering that uses the Azure fence agent SAP application servers deployed to an Azure Availability Set SAP HANA on Azure (Large Instances) that uses SAP HANA system replication for database high availability and disaster recovery
You have an SAP ERP Central Component (SAP ECQ) environment on Azure. You need to add an additional SAP application server to meet the following requirements:
1.
Provide the highest availability.
2.
Provide the fastest speed between the new server and the database. What should you do?
A. Place the new server in a different Azure Availability Zone than the database.
B. Place the new server in the same Azure Availability Set as the database and the other application servers.
C. Place the new server in the same Azure Availability Zone as the database and the other application servers.
You deploy an SAP environment on Azure.
You need to ensure that incoming requests are distributed evenly across the application servers.
What should you use?
A. SAP Web Dispatcher
B. SAP Solution Manager
C. SAP Control
D. Azure Monitor
You have an SAP production landscape on Azure that contains the virtual machines shown in the following table.
VM1 cannot connect to an employee self-service application hosted on VM2.
You need to identify what is causing the issue.
Which two options in Azure Network Watcher should you use? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point
A. Connection troubeshoot
B. Connection monitor
C. IP flow verify
D. Network Performance Monitor
You have a highly available deployment of SAP NetWeaver on Azure virtual machines. The database tier is hosted on two virtual machines that run Windows Server 2019 and have Microsoft SQL Server 2017 installed. The NetWeaver,
application, and database tiers each reside on a separate subnet within the same virtual network.
You run ABAPMeter against the deployment and discover that the average value of Act DB is 2 ms.
You need to lower the Acc DB value.
What should you do?
A. Increase the tempdb size on the SQL Server virtual machines.
B. Move the application virtual machines to the same subnet as the SQL Server virtual machines.
C. Configure the SQL Server database to use asynchronous replication.
D. Redeploy the NetWeaver. application, and SQL Server virtual machines to the same proximity placement group.
HOTSPOT
You are integrating SAP HANA and Azure Active Directory (Azure AD).
For each of the following statements, select Yes if the statement is true. Otherwise, select No.
NOTE: Each correct selection is worth one point.
Hot Area:
HOTSPOT
You are planning an SAP NetWeaver deployment on Azure. The database her will consist of Two Azure virtual machines that have Microsoft SQL Server 2017 installed. Each virtual machine will be deployed to a separate availability zone.
You need to perform the following:
1.
Minimize network latency between the virtual machines.
2.
Measure network latency between the virtual machines.
What should you do? To answer, select the appropriate options in the answer area.
Hot Area:
HOTSPOT
You are implementing a highly available deployment of SAP HANA on Azure virtual machines. You need to ensure that the deployment meets the following requirements:
1.
Supports host auto-failover
2.
Minimizes cost
How should you configure the highly available components of the deployment? To answer, select the appropriate options in the answer area. NOTE: Each correct selection is worth one point.
Hot Area:
HOTSPOT
You plan to deploy two Azure virtual machines that will host an SAP HANA database for an SAP landscape. The virtual machines will be deployed to the same availability set. You need to meet the following requirements:
Ensure that the virtual machines support disk snapshots.
Ensure that the virtual machine disks provide submillisecond latency for writes.
Ensure that each virtual machine can be allocated disks from a different storage cluster.
Which type of operating system disk and HANA database disk should you use? To answer, select the appropriate options in the answer area. NOTE Each correct selection is worth one point.
Hot Area: