ISTQB ATM Exam Dumps

  Printable PDF

ISTQB ATM Exam Dumps

Vendor: ISTQB
Exam Code: ATM
Exam Name: Advanced Test Manager
Certification: Test Manager
Total Questions: 64 Q&A
Updated on:
Note: Product instant download. Please sign in and click My account to download your product.

PDF Only: $49.99 VCE Only: $55.99 PDF + VCE: $65.99

99.5% pass rate
12 Years experience
7000+ IT Exam Q&As
70000+ satisfied customers
365 days Free Update
3 days of preparation before your test
100% Safe shopping experience
24/7 Support

ISTQB ATM Last Month Results

402
Successful Stories of ISTQB ATM Exam
99.4%
High Score Rate in Actual ISTQB Exams
92.6%
Same Questions from the Latest Real Exam

ATM Online Practice Questions and Answers

Questions 1

Which of the following statements, about the test reporting activities for a project adopting an iterative lifecycle model with very short iterations (e.g. two weeks iterations), is correct?

K2 1 credit

A. Test reporting activities can't be influenced by the use of an iterative lifecycle model with short iterations

B. Test reporting activities are not important for projects adopting an iterative lifecycle model with short iterations

C. Test reporting activities are less important for projects adopting an iterative life cycle model with short iterations. They should be performed at the end of the last iteration

D. Test reporting activities are still important with an iterative lifecycle. The reports can be used to conduct post-iteration review sessions before starting with the next iteration

Show Answer
Questions 2

Which of the following answers describes a factor that may reduce the effort spent when using distributed test teams without negatively affecting system quality?

K2 1 credit

A. Difficulties in communication between the distributed test teams due to time zone differences

B. With several distributed test teams, every team assumes that some test conditions are covered by other teams but actually no one covers them

C. With several distributed test teams, two or more teams assume some test conditions are covered by their team and their team alone. But all of the teams actually cover them

D. With several distributed test teams, all of the distributed test teams use a single unified test dashboard

Show Answer
Questions 3

You are the Test Manager of a project that adopts a V-model with four formal levels of testinG. unit, integration, system and acceptance testing.

On this project reviews have been conducted for each development phase prior to testing, which is to say that reviews of requirements, functional specification, high-level design, low- level design and code have been performed prior to testing.

Assume that no requirements defects have been reported after the release of the product.

Which TWO of the following metrics do you need in order to evaluate the requirements reviews in terms of phase containment effectiveness? K3 2 credits

A. Number of defects found during the requirements review

B. Total number of defects attributable to requirements found during unit, integration, system and acceptance testing

C. Total number of defects found during functional specification review, high-level design review, low-level design review, code review, unit testing, integration testing, system testing and acceptance testing

D. Time to conduct the requirements review

E. Total number of defects attributable to requirements, found during functional specification review, high

level design review, low-level design review, code review, unit testing, integration testing, system testing and acceptance testing

Show Answer More Questions

Hot Exams

Why ATM Dumps Are Worth It

Hannah Johnson

Leads4Pass is one of the best websites I have ever used. It only took me 3 days of preparation to complete my goal plan. Not only that, I was successful with high scores.

Joel C

It was the 16th when I purchased the Leads4Pass materials. They updated the materials on the 18th. When I asked them to send me the latest materials, they quickly sent me the latest ones. The new materials included several of the latest core question types. Finally, I succeeded. Six of the new core questions were completely matched. Thank you!

Martha W

I have used free materials, the privacy is poor, the public content matching rate is too low,I gave up on them because they failed me once. Leads4Pass was recommended by a friend. Both the privacy protection and the preciousness of the materials are very high. By the way, I won this time.

David Frazier

There is nothing more satisfying than success! Their question types are very similar, and they were very helpful to my progress in answering questions during the exam. Thank you.

Dolores N

I need to take multiple certification exams for my organization. There are so many certification exams that I can't help but choose supporting materials. I have tried multiple platforms with some success and failure. In the end, I chose Leads4Pass. It was instant for me. Effective materials are where the real value lies.

Helen Kovac

I was despised by a close friend until he failed twice and I passed once and then he changed his mind. He shared his failure experience with me. He told me that he had been learning through books and looking for free materials. These outdated contents could not really help him. Later I recommended him Leads4Passs and he also succeeded.

Raymond I

I was lucky enough to choose Leads4Pass for the first time. I used their VCE tool to learn, and it was really easy and efficient. I think what’s really amazing is that they can ensure that all materials are industry-leading, which is really amazing.

Leads4Pass Test Manager ATM Exam Analysis

The following table comprehensively analyzes the quality and value of Test Manager ATM exam materials.

leads4pass certification exam analysis
Advanced Test Manager(Test Manager)
PDF
PDF is the simplest and indispensable tool for certification exams. Leads4Pass Test Manager ATM PDF is suitable for learning in most environments.
VCE
VCE TestEngine is only available on Windows operating systems. Leads4Pass VCE comes at no additional cost and is free forever.No installation required, just unzip and use.Environmental protection and safety.
News
The overall pass rate of Leads4Pass reached 99.4%, Test Manager ATM successful cases were 402 last month, and the complete hit rate reached 92.6%!
Update
We check the update at least 1-2 times every month. If it is an official update, we will complete the most effective check of the update in 3 working days.
Team
Test Manager (ATM) exam materials are edited, reviewed, and finally sent to the front end by the Leads4Pass ISTQB multi-person team based on actual topics.
100%
100% the most cost-effective price in the industry
100% safe shopping
100% real and effective
100% money back guarantee
Leads4Pass guarantee comes from more than 10 years of experience and reputation