Click the Exhibit button.
Given the customer's programmed database shown in the exhibit and AC 1 = 9, over which RLI will a call placed to 9-1-912-534-2222 complete?
A. RLI 9
B. RLI 4
C. RLI 3
D. RLI 2
E. call will not complete as dialed
Click the Exhibit button.
Given the SDRR programming options shown in the exhibit, which SDRR programming would allow a user to dial 1-900-867-3333, but not successfully dial any other 1-900 based number?
A. Table 1
B. Table 2
C. Table 3
D. Table 4
Click the Exhibit button.
The local Central Office required that all calls dialed utilize dialing, however users forget to dial the NPA for local calls. Which DMI entry would be utilized to insert the NPA of 214 when a user dials 9- 774-3299?
A. DMI Table 1
B. DMI Table 2
C. DMI Table 3
D. DMI Table 4
In order to set up the Customer Data Block within Element Manager to support Zone Based Dialing, and assuming Package 420 ZBD Package is installed and active, what needs to be done first?
A. Configure Numbering Zones.
B. Select the Private Dial Plan from the customer's Features page.
C. Select the Public Dial Plan from the customer's Features page.
D. Select the "Enable Numbering Zones" option from the customer's Feature page.
You are configuring a bandwidth management zone on a Communication Server 1000 RIs. 7 x Call Server.
The Call Server zones will be used for interface communications between endpoints (IP telephones and
gateways).
Which is the preferred bandwidth management strategy, assuming the network has adequate bandwidth?
A. Best Quality (BQ)
B. Best Bandwidth (BB)
C. Allocated Bandwidth (AB)
D. Best Effort (BE)
Click the Exhibit button.
Given a customer's Coordinating Dialing Plan shown in the exhibit, if a Station user at CDP Switch #2 dials 327-3249, which route list used and where will the call terminate?
A. Route List 2 will be utilized and the call will terminate at CDP Switch #2
B. Route List 10 will be utilized and the call will terminate at CDP Switch #3
C. Route List 5 will be utilized and the call will terminate at CDP Switch #2
D. Route List 1 will be utilized and the call will terminate at CDP Switch #3
What new prompt is added to an IP set configuration to allow for assigning a set for Zone Based Doling?
A. the ZONE prompt
B. the NUMZONE prompt
C. the DIALPLAN prompt
D. the ZBO prompt
Due to Directory Number conflicts in the Communication Server 1000 network, the customer wants to route
calls by Home Location Codes (HLOC) and Location Codes (LOCs).
Consider the following Home Location Codes.
HLOC for system A = 329
HLOC for system B = 429
What LOC should be provisioned for system A?
A. LOC for System A = 3
B. LOC for System A = 49
C. LOC for System A = 329
D. LOC for System A = 429
Given the following network characteristics:
three Communication Server 1000 RIs. 7 x systems IP Peer Networking required DN uniqueness cannot be maintained route calls using site Location Codes (LOCs)
Which type of dialing plan is recommended for this call routing scenario?
A. Flexible Numbering Plan (FNP)
B. CoordinatedDialing Plan (CDP)
C. Uniform Dialing Plan (UDP)
D. NetworkAttendantNumbering Plan
Click the Exhibit button.
Refer to the customer's dialing plan and programming show in the exhibits. Assuming all required Route List Indexes have been programmed, why will the station user's dialed call of 8-1-717-398-8001 not complete?
A. AC2 Access Code was not dialed
B. NPA1717isnot provisioned in the customer's database
C. 398-8001 would be denied under the SDRR programming
D. AC1 AccessCodewas not dialed